2006 IBC Seminar- Solving Means of Egress in Commercial Buildings

Location:  

Map and Directions
Map
First Baptist Church
2709 Monument Ave.
Richmond, VA 23220

804-358-5458

Will you be attending this event?

Yes
No

Tell-A-Friend

Save to Calendar

View Other Events

Date:   5/30/2008 from 8:15 am - 4:00 pm (Eastern Time)

Hosted By:   The Virginia Society AIA
(804) 644-3041, ext. 207; jwalker@aiava.org
RSVP by:   May 27, 2008 at 5:00 pm (Eastern Time)


Earn 6 AIA/CES LUs (HSW)!

Featuring:

ICC Instructor, Mike Perrone, will provide the knowledge of requirements for means of egress including practice solving problems from a set of plans for a 4-story commercial building related to each egress issue.

 

Objectives:
Upon completion, participants will be better able to:
   List and describe each of the 3 parts of a means of egress
   Identify the 7 fundamental means of egress design issues
   Calculate occupant load and determine required means of egress capacity 
   Determine required number of exits 
   Determine requirements for arrangement means of egress facilities 
   Determine the requirements for fire resistance rated construction for egress elements
   Determine the requirements for design of egress elements
   Determine requirements for door hardware
   Determine requirements for locations and amounts of means of egress lighting and signage
   Evaluate the adequacy of a horizontal exit as part of a means of egress plan
   Evaluate the means of egress in assembly spaces 
   Determine requirements for exit access widths in smoke-protected assembly seating 
   Evaluate the adequacy of accessible means of egress

  • Parking, continental breakfast, and lunch included.


Please note: If you prefer to register by fax or mail, you can download and print a registration form. Forms should be faxed to (804) 643-4607 or mailed to Virginia Society AIA, 2501 Monument Avenue, Richmond, VA 23220.



 
     
   
Powered by image