|
To download the registration form click here. Earn 6 AIA/CES LUs (HSW)!
Featuring:
ICC Instructor, Mike Perrone, will go over the requirements for means of egress including practice solving problems from a set of plans for a 4-story commercial building related to each egress issue.
Objectives: Upon completion, participants will be better able to: - List and describe each of the 3 parts of a means of egress - Identify the 7 fundamental means of egress design issues - Calculate occupant load and determine required means of egress capacity - Determine required number of exits - Determine requirements for arrangement means of egress facilities - Determine the requirements for fire resistance rated construction for egress elements - Determine the requirements for design of egress elements - Determine requirements for door hardware - Determine requirements for locations and amounts of means of egress lighting and signage - Evaluate the adequacy of a horizontal exit as part of a means of egress plan - Evaluate the means of egress in assembly spaces - Determine requirements for exit access widths in smoke-protected assembly seating - Evaluate the adequacy of accessible means of egress
Parking, continental breakfast, and lunch included.
Please note: If you prefer to register by fax or mail, you can download and print a registration form. Forms should be faxed to (804) 643-4607 or mailed to Virginia Society AIA, 2501 Monument Avenue, Richmond, VA 23220.
|